Tiling the Master Bath
We spent most of the weekend tiling the master bathroom. I used hardie-board as an underlayment and we laid down a classic basket weave mossaic tile. We are very pleased with the way it turned out, although we should have cleaned the grout haze a bit sooner. I ended up having to use a polisher to remove the residue. I didn't want to lay the tile before the dry wall was installed, but circumstances forced the order of precedence. In order to get the huge clawfoot tub into the new space, we needed to leave the area by the door unframed, which meant that the floor needed to be tiled first. Once the tub is in, I'll frame in the door and have the drywall finished. Of course, we'll use Anthony for the drywall work.
No comments:
Post a Comment